Ongoing Projects
Brief Description
The scope of construction contract works covers the Construction of Health Center at Al Shamal (Package 9) are as follows: –
The project comprises Administration Offices, PCWIS (Primary Centre Walk-In Service), Walk-In Clinics, Imaging, Laboratory, and a Pharmacy on ground and first floors; and ancillary buildings incorporating a mosque, watchman rooms, Guard house, Waste Holding, Service Building and Ambulance Garage.
The construction method is generally of reinforced concrete structure and blockwork with all associated finishes, services and external works with boundary wall, gates, paving works and bitumen work including car parking and all associated soft and hard landscaping etc. Light structures utilize structural steel due to its light weight and long span capability.
Contractor shall provide the necessary tie-in to the existing roads at the entrance of the Health Center including paving, curbs, etc.; and all other statutory authorities’ connections to the Health Center beyond or from the boundary walls to the substations, IT/ Meter rooms etc., including information signage outside the boundary walls as required for the effective running of the facility.
Moreover, the Contractors shall consult each department of any excavation or demolition work to ascertain whether any underground installations will be affected.
All Atrium related works are to be carried out complete including but not limited to Cladding, Glass Handrail, Steel framed Skylights with operable panels with associated Services Engineering works as specified.