WOMEN’S CLUB SPORTS HALL PACKAGE 2

Sports Arenas

Client:

Khalifa Sports Development Committee

Consultant:

Arab Architects

Project Duration:

9 months structure only

Year Completed:

2005

Brief Description

The project consists of skeleton construction works that consists of three areas: Main building which consists of basis of basement and two floors with a big dome; warm up hall with a steel structural roof; and plant room which consists of two water tanks, pump room and electrical room.

The concrete structure building is covered by a steel structure and an aluminum dome. It is club that provides a wide range of sports and spa facilities exclusively for women.