Client:
Khalifa Sports Development Committee
Consultant:
Arab Architects
Project Duration:
9 months structure only
Year Completed:
2005
Sports Arenas
Client:
Khalifa Sports Development Committee
Consultant:
Arab Architects
Project Duration:
9 months structure only
Year Completed:
2005
Brief Description
The project consists of skeleton construction works that consists of three areas: Main building which consists of basis of basement and two floors with a big dome; warm up hall with a steel structural roof; and plant room which consists of two water tanks, pump room and electrical room.
The concrete structure building is covered by a steel structure and an aluminum dome. It is club that provides a wide range of sports and spa facilities exclusively for women.